Skip to content

Purchasing Cost

Definition

The purchasing cost is the amount paid per inventory unit, multiplied by the quantity purchased. If its constant unit price is cc and all demand is met at constant rate DD, the long-run purchasing cost rate is cDcD.


Interpretation

Purchasing cost is the money paid for the goods themselves, not the fixed charge per order or the cost of keeping stock. If all demand is met, on average DD units are bought per unit of time whatever the batch size, so a constant unit price cc gives the rate cDcD for every EOQ policy.

Two straight lines of cumulative purchasing cost over time, slope 340 at the normal price and slope 320 at the discounted price.

The lines show cumulative purchasing cost over days at D=2D=2 phones per day: slope 340340 at the price c1=170c_1=170, slope 320320 at the discounted price 160160. The batch size appears in neither line; it only decides which price applies.

A constant cDcD can therefore be left out when choosing the classical EOQ. With quantity discounts the unit price c(y)c(y) depends on the batch size yy, and then c(y)Dc(y)D must be compared together with setup and holding costs.


Key Results


Examples

  • In the figure, time is measured in days. At demand D=2D=2 phones per day and unit price c1=170c_1=170, the cumulative purchasing cost has slope c1D=340c_1D=340 per day.
  • A discounted unit price of 160 reduces that rate to 320 when the order qualifies.

Prerequisites

Sources

Aliases: purchase cost, procurement cost

Last updated: 20 October 2026 03:02